Skip to main content

The New Build Plumbing Process in Cedar City, UT

April 10, 2025

The new build plumbing process in cedar city ut

Building a new home or commercial space requires careful planning and execution, and plumbing is at the heart of it all! Here’s a behind-the-scenes look at the three key phases of the new build plumbing process:

  • Ground Rough-In: Before the foundation is poured, we lay the groundwork—literally! This phase involves trenching and installing the main water and sewer lines beneath the slab. Precision is key to ensure proper flow and drainage before the concrete is set.
  • Rough-In Plumbing: Once the framing is up, our team installs all the pipes, vents, and drains that will be hidden behind walls and under floors. This stage includes running water supply lines, setting up drain-waste-vent systems, and prepping for fixtures like sinks, tubs, and toilets. Inspections ensure everything meets code before drywall goes up.
  • Finish Plumbing: The final step—where it all comes together! After walls are painted and floors are in, we install the fixtures, faucets, water heaters, and appliances. Every connection is tested to ensure efficiency and functionality, delivering a seamless system ready for everyday use.

Project Details

Photo Gallery


Need Fast Plumbing or Electrical Help? Contact Our Plumbers & Electricians Now in Cedar City for Immediate Assistance!